NTI provided inspection of the $23 million remediation and structural overhaul of the 12-year old problem complex, which was closed in 2010 after being deemed “imminently dangerous.” Severe structural damage as a result of flawed design and construction defects necessitated the rehabilitation of the five-story, 163,000 square foot office building and bus mall including column, footing and drop panel enlargements, strengthening of structural components with carbon-fiber reinforced polymer (CFRP). Duties included reinforced concrete, proprietary anchors, structural steel, cold-formed steel framing, and carbon-fiber reinforced polymer inspections.